Latest News Current Position:Home >NEWS CENTER >

CITIC (Angola) Aluminium Extrudate Plant Achieves Complete Success in Load Test Run

Post on:2018-09-13Source:Africa Division

CITIC (Angola) Aluminum Extrudate Plant (CITIC Aluminum) achieved a complete success in a load test run on September 5, 2018 after the establishment and equipment installment that lasted for nearly two and half years, and it passed the performance evaluation smoothly.

The load test run finished by CITIC Aluminum, the first modernized factory that is equipped with the comprehensive productivity in the casting, extrusion and spray of aluminum alloy in Angola or even southwest Africa, has signified that it is completely equipped with the conditions for production.